We have executed more than 3,000 projects since 1968, including 52 major turnkey Lump Sum. Alliances with world-class companies, use of state of the art technology, compliance of safety, quality and environment guidelines, among other strengths, allow us to successfully meet our responsibilities and guarantee client satisfaction.

Projects by business areas

  • Crude refining and upgrading
    Debottlenecking Petromonagas Upgrader, Venezuela
    CLIENT
    Petromonagas
    LOCATION
    Complejo de Jose, Venezuela
    EXECUTION PERIOD
    2015 - 2017

    Increase in processing capacity from 157.8 MBPD of diluted crude to 188 MBPD, increasing the feed rate of the Delayed Coker Unit from 48 MBPD to 58 MBPD.

    Deep Conversion, Puerto La Cruz Refinery, Venezuela
    CLIENT
    PDVSA Petróleo S.A.
    LOCATION
    Puerto La Cruz Refinery, Venezuela
    EXECUTION PERIOD
    2007 - 2018

    EPC Global Sum.

    For the first time, HDHPlus® technology developed by Intevep, owned by PDVSA, is commercially applied. Engineering and procurement assistance takes place in three offices in Venezuela and Japan, with vertical distribution by process, service and auxiliary units.  Design, procurement assistance, construction management, installation and commissioning of units to process 210,000 barrels of crude per day to maximize the processing capacity of heavy and extra-heavy crude.

    +
    Petrolera Sinovensa expansion projects, Venezuela
    CLIENT
    PDVSA Engineering and Construction
    LOCATION
    Morichal, Venezuela
    EXECUTION PERIOD
    2014 - 2016

    Visualization, conceptual and basic engineering for increase in production capacity and handling of extra-heavy crude from 165,000 BD to 330,000 BD.

    Adaptation of Steam Generation System, El Chaure Refinery, PDVSA, Venezuela
    CLIENT
    PDVSA Petróleo S.A.
    LOCATION
    El Chaure Refinery, Venezuela
    EXECUTION PERIOD
    2012 - 2014

    Engineering and support for construction management for installation of new boilers.

    ULSD Compliance, Lemont and Corpus Christi refineries, Citgo, USA
    CLIENT
    CITGO Refining & Chemicals Co. L.P.
    LOCATION
    Illinois and Texas, USA
    EXECUTION PERIOD
    2007 - 2009

    Engineering, procurement assistance and construction management for expansion and operational improvements. Comprises two Hydrotreater units, designed to comply with the specification of minimum15 ppm or less sulfur content in diesel fuel. 

     

     

    Dung Quat Refinery, Técnicas Reunidas /PetroVietnam, Vietnam
    CLIENT
    Técnicas Reunidas / PetroVietnam
    LOCATION
    Quang Ngai province, Vietnam
    EXECUTION PERIOD
    2005 - 2007

    Technical assistance and detailed engineering for construction of crude distillation unit with 148,000 BPD capacity, Kerosene Treatment unit and the Fuel Gas unit.

    Rabigh Refinery, Técnicas Reunidas / ARAMCO Overseas Company BV and Sumitomo Chemical Co. Ltd., Saudi Arabia
    CLIENT
    Técnicas Reunidas S.A. / ARAMCO Overseas Company BV and Sumitomo Chemical Co. Ltd.
    LOCATION
    Rabigh, Arabia Saudita
    EXECUTION PERIOD
    2005 - 2007

    Detailed engineering of Sulfur Recovery (SRU), Hydrogen Production (HPU) and Vacuum distillation (VDU) units for the new refinery and interconnection with existing facilities.

    Crude production facilities
    Surface installations of Petrocarabobo, Venezuela
    CLIENT
    Petrocarabobo
    LOCATION
    Orinoco Oil Belt, Venezuela
    EXECUTION PERIOD
    2013 - 2016

    Basic engineering for surface installations. 

    Petroindependencia surface facilities, Venezuela
    CLIENT
    Petroindependencia
    LOCATION
    Orinoco Oil Belt, Venezuela
    EXECUTION PERIOD
    2013 - 2016

    Basic engineering in surface facilities and cost estimates Classes II and III. 

    Early production module of 40 MBD in DD Plant for Petrolera Sinovensa, Venezuela
    CLIENT
    Petrolera Sinovensa
    LOCATION
    Morichal, Venezuela
    EXECUTION PERIOD
    2013 - 2014

    Project Management Team (PMT) for the construction of the 40,000 BD Early Production Module.

    Adaptation of Main Station, Petrocedeño, Venezuela
    CLIENT
    PDVSA Engineering and Construction S.A. / Petrocedeño
    LOCATION
    Orinoco Oil Belt, Venezuela
    EXECUTION PERIOD
    2010 - 2012

    Detailed engineering to expand crude and water treatment facilities associated with oil from production clusters located in the Orinoco Belt.

    Crude Treatment Plant, Schlumberger, Venezuela
    CLIENT
    Schlumberger
    LOCATION
    Morichal, Venezuela
    EXECUTION PERIOD
    2015 - 2016

    Basic and detailed engineering of plant, close to Petromonagas Operating Center (COPEM).

    Petrolera Sinovensa Expansion, Venezuela
    CLIENT
    Petrolera Sinovensa
    LOCATION
    Morichal and Jose, Venezuela
    EXECUTION PERIOD
    2013 - 2015

    EPSCM.

    Project Management Consultant (PMC) of the EPC to expand Petrolera Sinovensa to increase production capacity to 165,000 BD.

    +
    Hydrocarbon transport, distribution and storage
    Dispatch system for upgraded crude from Jose, PDVSA Petróleo, Venezuela
    CLIENT
    Petrocedeño
    LOCATION
    Jose, Venezuela
    EXECUTION PERIOD
    2011

    Basic and detailed engineering of the crude dispatch line of Petropiar, Petromonagas, Petrocedeño and Petrolera Sinovensa, through the monobuoy, to optimize the operation.

    Evaluation of facilities at Rio Grande Drive Point Lisas, Phoenix Park Gas Processors Limited (PPGPL), Trinidad & Tobago
    CLIENT
    Phoenix Park Gas Processors Limited (PPGPL)
    LOCATION
    Couva, Trinidad & Tobago
    EXECUTION PERIOD
    2016

    Evaluation of facilities to import high quality products; includes review and adaptation of port facilities to receive vessels with capacity for 130,000 barrels of refrigerated propane/butane.

    Fuel Terminal, SemMaterials México S.A. de C.V., Mexico
    CLIENT
    SemMaterials México S.A. de C.V., subsidiary of SemGroup Corporation
    LOCATION
    Puerto Progreso, Mexico
    EXECUTION PERIOD
    2015

    Advanced conceptual engineering for a storage tank yard and a fuel distribution terminal.

    Increase of dispatch capacity in the Jose Storage and Shipment Terminal, Venezuela
    CLIENT
    PDVSA Petróleo S.A.
    LOCATION
    Jose and Puerto La Cruz, Venezuela
    EXECUTION PERIOD
    2011 - 2015

    Expansion of dispatch capacity of Jose Storage and Shipping Terminal (TAEJ) and Jose Operation Terminal (TOJ).

    Northeastern Gas Pipeline General en Jefe José Francisco Bermúdez, Venezuela
    CLIENT
    PDVSA Gas S.A.
    LOCATION
    Anzoátegui state, Venezuela
    EXECUTION PERIOD
    2007 - 2011

    Executed by the Barbacoa-Margarita Consortium, led by inelectra. Construction management of a 214-km gas pipeline, with a 1,200 psi maximum operating pressure, between Barbacoa, Anzoátegui state, and Margarita island to provide a natural gas transport and supply system for the east of the country.

    +
    Offshore facilities
    Engineering facilities and maritime platforms
    CLIENT
    Shell de Venezuela S.A. / Petroregional del Lago (PERLA)
    LOCATION
    Lake Maracaibo, Venezuela
    EXECUTION PERIOD
    1998 - 2007

    Basic and detailed engineering, technical assistance and studies for projects of operations and maintenance of production facilities in West Urdaneta field.

    Offshore facilities for Deltan Platform and Manatee field, Venezuela - Trinidad & Tobago
    CLIENT
    Chevron
    LOCATION
    Delta Amacuro, Venezuela - Beachfield, Trinidad & Tobago
    EXECUTION PERIOD
    2007

    Evaluation of options of type of platform, deck equipment and underwater gas pipelines up to Güiria in Venezuela and Beachfield in Trinidad; study for definition of compression scheme and pre-selection of main equipment.

    Offshore development of Lorán-Manatee gas field, Venezuela - Trinidad & Tobago
    CLIENT
    Chevron
    LOCATION
    Cross-border line between Venezuela and Trinidad & Tobago
    EXECUTION PERIOD
    2011 - 2012

    Engineering support for Phase 2 (pre-FEED) and Phase 3 (FEED).

    Living quarters platforms HA-ZAAP-C and HA-KU-H, Mexico
    CLIENT
    PEMEX Exploration and Production (PEP)
    LOCATION
    Bay of Campeche, Mexico
    EXECUTION PERIOD
    2005 - 2007

    EPC for two platforms with capacity for 220 people each. 

    +
    Gas production, processing and compression
    Expansion of LPG-5 Compressor Plant for export of gas to Colombia, INSERVEN / PDVSA Gas, Venezuela
    CLIENT
    INSERVEN / PDVSA Gas S.A.
    LOCATION
    Lake Maracaibo, Venezuela
    EXECUTION PERIOD
    2015 - 2016

    Installation and start-up of two turbochargers and auxiliary equipment, along with infrastructure and services required for later installation of two more units.

    Yucal Placer Phase 300 Ypergas Guárico, Doris Engineering, Venezuela
    CLIENT
    Doris Engineering S.A.
    LOCATION
    Yucal Placer Field, Venezuela
    EXECUTION PERIOD
    2012 - 2014

    Design of CPF2 and five clusters to obtain 300 million SCFD of gas.

    Engineering for North Field gas compressor plant TOSL Engineering Ltd. / Petrotrin-Trinmar, Trinidad & Tobago
    CLIENT
    TOSL Engineering Ltd. / Petrotrin-Trinmar
    LOCATION
    North Field, Trinidad & Tobago
    EXECUTION PERIOD
    2007 - 2008

    Interconnection of pipes and civil platforms for gas compressor plant of the North Field of natural gas CP#4.

    Modifications to existing Gas Conditioning Plant (ACOGAS), Venezuela
    CLIENT
    PDVSA
    LOCATION
    Jusepín, Venezuela
    EXECUTION PERIOD
    1997 - 1998

    EPC Lump Sum - Turnkey.

    Increase in gas processing capacity from 250 million CFD to 350 million CFD to raise production of Natural Gas Liquids (NGL) from 12,000 BD to 35,000 BD.

    +
    Field development
    Feasibility study development of block in Orinoco Oil Belt, Venezuela
    CLIENT
    Confidential
    LOCATION
    Orinoco Belt, Venezuela
    EXECUTION PERIOD
    2014

    Conceptual engineering of field facilities and integration with upgrading units to produce 200 mbpd.

    Feasibility study for heavy crude secondary recovery field
    CLIENT
    Confidential
    LOCATION
    Venezuela
    EXECUTION PERIOD

    Visualization and analysis of technical-economic feasibility to increase production of a mature field by steam injection.

    +
  • Rehabilitation of the Ammoniac Plant IV - Phase I, Mexico
    CLIENT
    ARENDAL/PEMEX
    LOCATION
    Complejo Petroquímico Cosolecaque, Mexico
    EXECUTION PERIOD
    2012 - 2013

    Engineering for the rehabilitation to its original design conditions, for the start-up of the IV Ammoniac Plant of Pemex Fertilizantes. 

    +
    Gas Collection Station, Lakach field, Mexico
    CLIENT
    Arendal / Pemex
    LOCATION
    Lakach Field, Mexico
    EXECUTION PERIOD
    2014 - 2016

    Development of detail engineering and studies for the Lakach ERG project.

    +
    Expansion of Methanol Plant, Venezuela
    CLIENT
    Metanol de Oriente S.A. (METOR) (Pequiven, Mitsubishi Gas Chemical, Mitsubishi Corporation and Empresas Polar)
    LOCATION
    Jose, Venezuela
    EXECUTION PERIOD
    2006 - 2010

    EPC Lump Sum - Turnkey.

    Expansion of existing units from 750,000 to 1,600,000 MTY.

    +
    Polyethylene Plants I and II, Ecopetrol, Colombia
    CLIENT
    Ecopetrol S.A.
    LOCATION
    Barrancabermeja, Colombia
    EXECUTION PERIOD
    2007 - 2009

    EPCM for recovery of service factor in Polyethylene I and II plants and increase hourly production in Polyethylene II from 9,263 LBH to 12.000 LBH.

    Metor Methanol Plant, Venezuela
    CLIENT
    Metanol de Oriente S.A. (METOR) (Pequiven, Mitsubishi Gas Chemical, Mitsubishi Corporation and Empresas Polar)
    LOCATION
    Jose, Venezuela
    EXECUTION PERIOD
    1991 - 1994

    EPC Lump Sum - Turnkey.

    Construction of a 750,000 MTY capacity methanol production plant, one of the largest in the world in the 1990s.

    +
    Engineering and procurement for various projects, Propilenos de Falcón (PROFALCA), Venezuela
    CLIENT
    Propilenos de Falcón C.A. (PROFALCA)
    LOCATION
    Paraguaná, Venezuela
    EXECUTION PERIOD
    2006 - 2007

    Operational improvements.

    +
    Polypropylene Plant Expansion, Venezuela
    CLIENT
    Polipropileno de Venezuela S.A. (PROPILVEN)
    LOCATION
    El Tablazo, Venezuela
    EXECUTION PERIOD
    2002 - 2004

    EPC Lump Sum.

    Increase in capacity of Polypropylene Plant from 86,000 MTY to 110,000 MTY.

    +
  • Termozulia III Combined Cycle, Venezuela
    CLIENT
    CORPOELEC
    LOCATION
    La Cañada de Urdaneta, Venezuela
    EXECUTION PERIOD
    2010 - 2013

    EPC Lump Sum.

    500 MW Combined Cycle Termozulia III plant.

    +
    Altamira Electricity Cogeneration Plant, Mexico
    CLIENT
    Avanzia Instalaciones S.A. de C.V.
    LOCATION
    Altamira, Mexico
    EXECUTION PERIOD
    2016 - 2018

    Lump sum per advance

    Detailed engineering of a 325 MW cogeneration plant to cover power and steam requirements of the Akra Polyester Complex Altamira.

    +
    José de San Martín Thermoelectric Plant, Argentina
    CLIENT
    José de San Martin Thermoelectric Plant
    LOCATION
    Timbúes, Argentina
    EXECUTION PERIOD
    2006 - 2009

    EPC Lump Sum - Turnkey.

    800 MW combined cycle of the José de San Martín Thermoelectric Plant.

    +
    Termobarrancas Power Plant, Venezuela
    CLIENT
    Termobarrancas, subsidiary of Repsol YPF
    LOCATION
    Obispos, Venezuela
    EXECUTION PERIOD
    2006 - 2007

    EPC Lump sum.

    Open cycle of a thermoelectric plant and a 230 kV substation.

    +
    IPP Cardón Refinery, Venezuela
    CLIENT
    GENEVAPCA, subsidiary of C.A. La Electricidad de Caracas
    LOCATION
    Cardón, Venezuela
    EXECUTION PERIOD
    1994 - 1996

    EPC Lump Sum - Turnkey.

    300 MW and 160 ton/hour capacity.

    +
    LAFITO Haiti Project MV Transmission Line and HFO Pipeline, GB Group, Haití
    CLIENT
    GB Group
    LOCATION
    Lafito, Haití
    EXECUTION PERIOD
    2015 - 2016

    Professional engineering services for preparation of recommendations for configuration of Medium Voltage Distribution System to supply local consumers and conceptual engineering of Discharge System and Heavy Fuel Oil (HFO) Line for transport of 22,000 barrels HFO.

    +
  • Agroindustrial Sugarcane Derivatives Complex, Ospino, Venezuela
    CLIENT
    PDVSA Agrícola S.A.
    LOCATION
    Ospino, Venezuela
    EXECUTION PERIOD
    2011 - 2012

    Construction of a 10,600 MT/day agroindustrial complex.

    +
    Puerto Cabello - La Encrucijada Railway, Venezuela
    CLIENT
    Instituto Autónomo de Ferrocarriles del Estado (IAFE)
    LOCATION
    Puerto Cabello-La Encrucijada, Venezuela
    EXECUTION PERIOD
    2002 - 2005

    Second stage of rail system for the Central Region.

    +
    Integrated Architecture Management, new CAF headquarters, Venezuela
    CLIENT
    Andean Development Corporation (CAF) / Development Bank of Latin America
    LOCATION
    Caracas, Venezuela
    EXECUTION PERIOD
    2012 - 2014

    Global sum + reimbursable expenses.

    Architectural, engineering and project management services for the new CAF Headquarters.

    +
    Metro de Caracas, Lines 1, 2, 3 and 4; technical assistance for Metro de Los Teques, Venezuela
    CLIENT
    C.A. Metro de Caracas
    LOCATION
    Caracas, Venezuela
    EXECUTION PERIOD
    1978 - 2007

    Inspection, design and construction management and procurement.

    +
    Siderúrgica Nacional, state steel plant, Venezuela
    CLIENT
    Construtora Andrade Gutierres S.A.
    LOCATION
    Ciudad Piar, Venezuela
    EXECUTION PERIOD
    2010

    Design of foundations of all industrial buildings and basic infrastructure; development of briquette transport system from train unloading area to the briquette silos.

    +
    Modernization of Guanare Sugar Mill, Venezuela
    CLIENT
    Odebrecht
    LOCATION
    Guanare Sugar Mill, Venezuela
    EXECUTION PERIOD
    2013 - 2014

    Lump Sum

    Improvement and increase of capacity of Rio Guanare Sugar Mill to process 5,000 TCD.

    +



Caracas Headquarter

Circunvalación del Sol Avenue, Inelectra Building, Santa Paula, Caracas 1061-A, Venezuela. PO Box 65641.

(58-212) 981.55.55

(58-212) 985.03.84

Mexico

Montes Urales 760 Col. Lomas de Chapultepec, Del. Miguel Hidalgo, 2nd floor. Ciudad de Mexico, 11010

+52 55 7592 1480