Lump sum per advance

Detailed engineering of a 325 MW cogeneration plant to cover power and steam requirements of the Akra Polyester Complex Altamira.

CLIENT

Avanzia Instalaciones S.A. de C.V.

LOCATION

Altamira, Mexico

Scope
Detailed engineering
Procurement activation
Start-up procedures

Image
Image
Image
Image
Image
Image

Other projects


Image
Termozulia III Combined Cycle, Venezuela
Power generation

Termozulia III Combined Cycle, Venezuela

Power generation

+
Image
José de San Martín Thermoelectric Plant, Argentina
Power generation

José de San Martín Thermoelectric Plant, Argentina

Power generation

+
Image
Termobarrancas Power Plant, Venezuela
Power generation

Termobarrancas Power Plant, Venezuela

Power generation

+



Caracas Headquarter

Circunvalación del Sol Avenue, Inelectra Building, Santa Paula, Caracas 1061-A, Venezuela. PO Box 65641.

(58-212) 981.55.55

(58-212) 985.03.84

Mexico

Montes Urales 760 Col. Lomas de Chapultepec, Del. Miguel Hidalgo, 2nd floor. Ciudad de Mexico, 11010

+52 55 7592 1480